- Tantalum Investing News - http://tantaluminvestingnews.com -
First Gold Intersects 1.24% Li2O, 2,206 g/t Rubidium, 148 ppm Ta2O5, 129 ppm Beryllium, 76 ppm Gallium and 93 ppm Cesium Over 14.45 Metres in Hole LR-10-60
August 6, 2010 @ 10:58 am In Tantalum Company News
First Gold Exploration Inc. (CVE:EFG) reported the most recent drill results for the Lac Pivert/Rose project.
The press release is quoted as saying:
These positive results demonstrate the continuity and consistency of the lithium, tantalum, rubidium, beryllium, gallium and cesium values. The drilling program is continuing and is presently on drillhole # LR-10-102. LR-10-102 has cut through a zone that measures more than 18 metres in thickness. This drillhole is located 250 meters to the East of the drillhole no LR-10-50 that had values of 1.29% Li2O, 2565 g/t Rubidium, 245 g/t Ta2O5, 148 g/t Beryllium, 123 g/t Cesium and 67 g/t Gallium over 14 meters.
Click here to access the entire press release [1]
Click here to access First Gold Exploration Inc. Corporate Site [2]
Article printed from Tantalum Investing News: http://tantaluminvestingnews.com
URL to article: http://tantaluminvestingnews.com/909/first-gold-intersects-1-24-li2o-2206-gt-rubidium-148-ppm-ta2o5-129-ppm-beryllium-76-ppm-gallium-and-93-ppm-cesium-over-14-45-metres-in-hole-lr-10-60/
URLs in this post:
[1] Click here to access the entire press release: http://www.marketwire.com/press-release/First-Gold-Intersects-124-Li2O-2206-g-t-Rubidium-148-ppm-Ta2O5-129-ppm-Beryllium-76-TSX-VENTURE-EFG-1300607.htm
[2] Click here to access First Gold Exploration Inc. Corporate Site: http://www.firstgoldexploration.com/
Copyright © 2010 Tantalum Investing News. All rights reserved.